NOVALUX · Energy & e-mobility
Battery storage
Battery storage needs a clear picture of when electricity is available and when it is needed. NOVALUX records your intended use and existing system so the battery, inverter and electrical integration can be considered together.
Enquire about your project
Who is this service for?
- Private clients
- Businesses
- Property managers
Possible scope of work
- Distinguish self-consumption, shifting energy use and other requested functions.
- Record compatibility requirements for existing photovoltaics and controls.
- Include installation conditions, expansion and electrical interfaces in the scope.
What you receive
- A scope matched to your information with the relevant technical interfaces identified.
- Depending on the confirmed commission: agreed functions and the associated operating and handover information.
From enquiry to handover
Record functions and existing systems
Describe the intended use and identify existing components. Concrete examples are more useful than a general list of preferred products.
Clarify interfaces and scope
Compatibility, access and responsibilities are assessed against the actual system. Necessary preparation and dependencies form part of the agreed scope.
Provide an understandable handover
Agreed functions, controls and relevant records determine the handover. Additional requests or subsequent changes in system conditions are agreed separately.
What we need for your quotation
- PV and inverter details
- Consumption profile and desired storage functions
- Photographs and details of the proposed installation location
Frequently asked questions
Will everything keep running during a power cut?
Not automatically. This requires an appropriately designed backup function and defined supported circuits. Name the loads you want to keep available.
Does any battery fit my PV system?
No. The inverter, interfaces and manufacturer architecture limit possible combinations. Exact model information and existing records matter for the assessment.
Can capacity grow later?
That depends on the specific system and its expansion conditions. Share planned additional loads early so future requirements can inform the selection.